This university construction project featured a complex five-floor pan slab deck system, including massive 6-foot by 7-foot deep beams and a sloped roof topping slab designed for efficient drainage. Built within an active campus environment, the project required tight logistical coordination to minimize disruption to students and university operations.
Through detailed scheduling, weekly progress tracking, and close collaboration with the general contractor and field teams, the project was successfully completed on schedule from February through August 2024.