CVG 3- Dermody

Customer

United Construction Midwest

Owner

Dermody Properties

Project Size

254,000 square feet

Project Location

Hebron, KY

Lithko Location

After completing the Wayfair Fulfillment Center, Lithko secured the second distribution center for Dermody Properties at CVG (Cincinnati/Northern Kentucky International Airport). Our scope includes foundations, footings, slab on grade, tilt-up panels, paving, and sitework.

During the planning process, our project team identified a few potential schedule and logistic issues. With the location of the project site being directly across the street from a residential unit, we needed to be mindful during night concrete placements. By using our Daily Preparation Processes, we remedied the situation by moving the truck entrance. This logistical change minimized the noise and light disturbance to the adjacent residents.

Utilizing our Project Execution Process, we developed a detailed plan to accelerate the project schedule. With the winter quickly approaching, we needed to ensure completion of the tilt up panels. By following our plan and tracking outcomes daily, we were successful in erecting all 119 tilt up panels two weeks ahead of schedule. We protected quality by double checking the location of embeds and reveals in the panels before placing the concrete.

Projects

Filter by:

Lilly Concord

Scope of Work: Basement: 90,000 square feet, 22 feet tall cast in place walls 42,000 cubic yards of concrete Concrete...
Eastgate1 2 100821 249

Prologis Buildings 1, 2, 3

Scope of Work: Foundations, slab on grade, tilt-up panels, paving Description: The project encountered unique challenges such as integrating steel...
Project Night

Project Night

Scope of Work: Foundations, tilt-up panels, Ductilcrete Heidebed System, miscellaneous site work Description: In 2021, we constructed a new storage...