DHEC Labs
Customer
Whiting Turner
Owner
State of South Carolina: Department of Health and Environmental Control
Industry
Project Size
230,000 square feet
Project Location
Columbia, SC
Lithko Location
This healthcare construction project required advanced coordination within a constrained site, including strategic tower crane integration into the building’s structural foundations to maximize efficiency and maintain critical schedule milestones.
The team utilized the Titan formwork system, supported by BIM modeling, multiple field engineers, and detailed production tracking to manage tight cast-in-place concrete tolerances and complex sequencing. Through proactive planning and quality control, Lithko delivered high-quality steel-troweled concrete floors ready for polished finishes in this demanding medical facility environment.
Projects
Filter by:

St. Francis Parking Garage

UK Cancer Treatment Center & Advanced Ambulatory Center