Golden Triangle

Customer

CFC Construction

Owner

Argyle Residential

Industry

Project Size

105,000 square feet

Project Location

Denver, CO

Lithko Location

In the heart of downtown Denver, a new 176-unit mixed use building is under construction. Our package includes drilled piers, foundations, pier caps, grade beams, slab on grade, columns, two stair cores, one elevator core, shear walls, and post tension structural decking. There are 5 ½ levels of a cast in place parking structure, including a podium slab on level 6 with prescient framing. The slab on grade will incorporate multiple elevation changes as well as cast in place walls and retail space.

Downtown construction always poses logistical challenges due to limited laydown space and entrances into the site. Our team is heavily focused on detailed coordination of all our deliveries, concrete pump set up and truck staging. Our daily plan process has been key to the forward momentum of the project while working around and coordinating with the other trades.

Projects

Filter by:

Edited 600 S Tryon (2)

600 South Tryon

Description: Our Charlotte team used their expertise to successfully execute 25 floors of the cast in place structure, stairs and...

The Pearl Education & Research Buildings

Description: The Pearl buildings demanded, continuous logistical adaption due to the adjacent site infrastructure upgrades, including main powerlines. Starting with...
Factor 52 HGC PG (2)

Kenilworth Parking Structure

Scope of work: Foundations, walls, columns, slab on grade, framed deck, cast in place...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.