Jacksonville Airport Terminal B Expansion
Customer
Balfour Beatty Construction
Owner
JAA
Industry
General
Project Size
180,000 square feet
Project Location
Jacksonville, FL
Lithko Location
This airport construction project featured an FAA-regulated slab-on-grade system requiring highly precise sloped concrete placement to ensure proper drainage and prevent water ponding in active aircraft taxi areas. The project also included a large mat foundation supporting a 35,000-square-foot mechanical pit.
Projects
Filter by:

7th and Pleasant Valley
This multifamily construction project features a cast-in-place concrete podium with 16- to 22-inch-thick transfer slabs supporting wood-framed apartments above. Lithko...

TTC Lemley
This university construction project featured massive cast-in-place concrete walls rising 40 feet to the roof and enclosing an 80-by-70-foot space....

Plant Zero Apartments
Plant Zero Apartments is a multifamily residential development featuring a cast-in-place concrete podium supporting wood-framed residences above. Lithko’s scope includes...