Jacksonville Airport Terminal B Expansion

Customer

Balfour Beatty Construction

Owner

JAA

Industry

General

Project Size

180,000 square feet

Project Location

Jacksonville, FL

Lithko Location

This airport construction project featured an FAA-regulated slab-on-grade system requiring highly precise sloped concrete placement to ensure proper drainage and prevent water ponding in active aircraft taxi areas. The project also included a large mat foundation supporting a 35,000-square-foot mechanical pit.

Working within an active airport environment required strict FAA security protocols, daily screenings, and constant resequencing around airside operations. Rigorous QA/QC procedures ensured slab elevations and slopes met exact FAA tolerances, while all safety systems and equipment complied with airfield operational standards.

Projects

Filter by:

7th and Pleasant (24)

7th and Pleasant Valley

This multifamily construction project features a cast-in-place concrete podium with 16- to 22-inch-thick transfer slabs supporting wood-framed apartments above. Lithko...
TTC Lemley (8)

TTC Lemley

This university construction project featured massive cast-in-place concrete walls rising 40 feet to the roof and enclosing an 80-by-70-foot space....
Plant Zero Apartments (5)

Plant Zero Apartments

Plant Zero Apartments is a multifamily residential development featuring a cast-in-place concrete podium supporting wood-framed residences above. Lithko’s scope includes...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.