Kroger Distribution Center Addition

Customer

Ryan Companies

Owner

Kroger

Project Size

177,000 square feet

Project Location

Aurora, CO

Lithko Location

Kroger is expanding its distribution center in Aurora, CO by 177,00 square feet, adding 52 jobs to the area. We are installing the foundations, walls, piers, slab on grade, and sitework, which includes the dock apron, sidewalk, stoops, and light pole bases.

Since this is an expansion, we are working alongside a live building, which can bring many challenges. Our team had to designate specific routes for the construction trucks. We had to plan for a flagging system to ensure all trucks came in and out of the project correctly, not disrupting live operations.

To accommodate their racking system, the design includes 53,000 square feet of an automated (depressed) 16” thick slab that will sit 2’10’’ below the floor. The slab requires a tolerance of FF50/FL35. Typically, we would utilize a laser screed to achieve these numbers, but due to the depth of the slab and the double layer of rebar we could not use this placing method. Instead, we placed 4 long strips for the slab and utilized a roller screed to ensure we hit the desired tolerances. We recently finished the fourth placement and exceeded the FF50/FF35 requirement.

Projects

Filter by:

4 Hilmar

Large Manufacturing Project

Scope of Work: 410,757 slab on grade (multiple drain/sloping floors) , 42,500 square feet of slab on metal deck, foundations,...

Lilly Concord

Scope of Work: Basement: 90,000 square feet, 22 feet tall cast in place walls 42,000 cubic yards of concrete Concrete...
Eastgate1 2 100821 249

Prologis Buildings 1, 2, 3

Scope of Work: Foundations, slab on grade, tilt-up panels, paving Description: The project encountered unique challenges such as integrating steel...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.