Lilly Concord

Customer

Gilbane Building Company

Owner

Lilly

Project Size

1,300,000 square feet

Project Location

Concord, NC

Lithko Location

This pharmaceutical manufacturing facility featured complex below-grade concrete construction, including a 20-foot-deep basement, underground tunnel systems, radius ramp walls, and cast-in-place structural elements integrated into a hydraulic spillway system.

The project also included a high-performance ASRS deep freezer storage structure designed for temperature-sensitive pharmaceutical products. Massive slab placements with extremely tight tolerances were required to support automated storage and retrieval systems, showcasing expertise in industrial concrete construction, freezer slab systems, and precision manufacturing facility execution.

Projects

Filter by:

U.S. Motorworks (16)

U.S. Motorworks

This manufacturing facility project features a complex tilt-up concrete structure built into a steep hillside, including a cast-in-place retaining wall...
Pecan Deluxe 5 (1)

Pecan Deluxe 5

This manufacturing facility project featured a large industrial cooler with high-tolerance sloped concrete floors designed to manage water from candy...
Freshpet Manufacturing Expansion (2)

Freshpet Manufacturing Expansion

The Freshpet manufacturing facility required specialized industrial concrete construction, including high-tolerance sloped slabs, precision-formed curved concrete curbs, and freezer slab...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.