Medpace 400 Madison Square

Customer

Skanska

Owner

Medpace

Industry

Project Size

600,000 square feet

Project Location

Cincinnati, OH

Lithko Location

After a successful outcome building the Dolce Hotel and Parking Garage with RBM Development and Skanska, Lithko was selected to install the concrete package at the new Medpace office tower on the same site, Madison Square Development. Our package includes foundations, perimeter walls, columns, slab on grade, structural deck and slab on metal deck.

The team utilized mudsills to support the shoring of the first elevated slab, due to schedule constraints and not having an underground subcontractor on the site.   Due to the excessive amount of rain and the lack of concrete to build off, the team installed an underground drain system to help protect the subgrade from damage and to help keep the project moving on schedule.

With team members that were new to some key roles role on the project, the Operations Manager emphasized the importance of the Project Execution Process to ensure success.  Prior to the start of the project, the Project Lead and his team produced Phase Plans for all the work activities.  Constant changes to the design drawings made daily interaction with the team critical for revisions and to ensure that the DPP was correct for the next day’s activities.  By honoring the system, it has allowed us to track the growth of the team throughout the project.

During the planning phase, we were tasked with assisting the owner with solutions to minimize cost to the project. We presented a solution, which the customer accepted,  to use a barrier cable system rather than crash walls. Barrier cables are not only more cost effective, but they weigh a lot less and provide more design flexibility.

Projects

Filter by:

Edited 600 S Tryon (2)

600 South Tryon

Description: Our Charlotte team used their expertise to successfully execute 25 floors of the cast in place structure, stairs and...

The Pearl Education & Research Buildings

Description: The Pearl buildings demanded, continuous logistical adaption due to the adjacent site infrastructure upgrades, including main powerlines. Starting with...
Factor 52 HGC PG (2)

Kenilworth Parking Structure

Scope of work: Foundations, walls, columns, slab on grade, framed deck, cast in place...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.