This airport construction project at Miami International Airport required innovative problem-solving and close coordination to overcome challenging site conditions, including a high water table just below grade. Working with the GC and design team, Lithko helped redesign the original below-grade foam containment pits into an above-grade fire suppression system, maintaining hangar performance while keeping the project on budget.

As Lithko’s first project in Miami-Dade County, the team successfully met all Community Workforce Development Program local hiring requirements. Lithko also coordinated with high-performance concrete specialists to validate hangar slab compatibility and achieve the required low-reflectivity concrete finish for aviation operations.

 

Projects

Filter by:

7th and Pleasant (24)

7th and Pleasant Valley

This multifamily construction project features a cast-in-place concrete podium with 16- to 22-inch-thick transfer slabs supporting wood-framed apartments above. Lithko...
TTC Lemley (8)

TTC Lemley

This university construction project featured massive cast-in-place concrete walls rising 40 feet to the roof and enclosing an 80-by-70-foot space....
Plant Zero Apartments (5)

Plant Zero Apartments

Plant Zero Apartments is a multifamily residential development featuring a cast-in-place concrete podium supporting wood-framed residences above. Lithko’s scope includes...