To accommodate the student population, Morehead State University is adding 400 more parking spaces and a new dining hall, all financed by private funds. Lithko’s package includes foundations, slab on grade, structural deck, and topping slabs for the precast parking garage.

Due to the project location of an active university campus, our project team had to work with a tight site. To add to the complications, the thirty-eight foot tall retaining wall was to be built up against a hill. Resulting in limited laydown space, the team came up with the solution to set up the crane and formwork inside the building. To avoid heavy traffic during school hours on the narrow hard terrain roads, we transported the equipment during off school hours.

By understanding our outcomes on a daily basis, we were able to adjust to these challenges and opportunities quickly, which all contributed to achieving the 13 month project schedule.

Projects

Filter by:

UC New Old Chemistry Building

Scope of work: Foundations, retention system walls, elevator cores, slabs on grade, slabs on metal deck, framed deck with beams,...
Washington International School, Washington DC, MCN Build, Mid Atlantic BURG

Washington International School

Scope of work: Footings, columns, on-sided / two-sided foundation walls, post-tension elevated...

WTCC Parking Deck

Wake Technical Community College (Wake Tech) in Raleigh, North Carolina is the state’s largest community college, serving more than 70,000...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.