MUSC Children’s Hospital & Women’s Pavilion

Customer

The Robins & Morton Group

Owner

Medical University Hospital Authority

Industry

Project Size

650,000 square feet

Project Location

Charleston, SC

Lithko Location

The MUSC Children’s Hospital & Women’s Pavilion will be the largest, most extensive health care facility for mothers and children in the state of South Carolina. Countless lives are impacted by this project and it is designed to have a 100-year service life. Our Charleston team was selected as the concrete contractor and our package includes heavy seismic foundations (4 x 100 x 6 feet deep), foundation walls, slab on grade, slab on metal deck, high tolerance toppings/equipment pads, and pan stairs.

Due to the proximity of the ocean, the building requires heavy foundations along with extremely large anchor bolts (3 ½ diameter, 7 ft. tall, 200 lbs.)  During our upfront planning process, we acknowledged it was going to be extremely challenging to keep the anchor bolts ¼ of an inch from the spec. We built a support mechanism, which ended up being highlighted by Robins and Morton and shared with other projects.  The high tolerance toppings/equipment pads were achieved by constantly checking the elevation during each placement.

With the very active hurricane season, our team has been very proactive in prepping for strong weather conditions. One week prior to hurricane Irma, the team had a detailed plan laid out and communicated with the entire project team. They utilized a marker board in their trailer to keep their hurricane plan, so everyone could view. They delivered a high wind Operational Activity Training as well. Our daily planning process and our quality control plan were also shared as best practices to other trades by Robins and Morton.

Projects

Filter by:

Edited 600 S Tryon (2)

600 South Tryon

Description: Our Charlotte team used their expertise to successfully execute 25 floors of the cast in place structure, stairs and...

The Pearl Education & Research Buildings

Description: The Pearl buildings demanded, continuous logistical adaption due to the adjacent site infrastructure upgrades, including main powerlines. Starting with...
Factor 52 HGC PG (2)

Kenilworth Parking Structure

Scope of work: Foundations, walls, columns, slab on grade, framed deck, cast in place...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.