Omni Oklahoma City

Customer

Brasfield and Gorrie

Owner

OMNI OKC, LLC

Industry

Project Size

675,600 square feet

Project Location

Oklahoma City, OK

Lithko Location

Situated between the new convention center and Chesapeake Energy Arena, Omni Oklahoma City Hotel will be a nationwide destination for meetings and events, with 76,000 square feet of meeting space located on the second floor, an outdoor event lawn on the third floor, and a boardroom located on the 17th floor which can be used as a convenient and private meeting space for visiting NBA teams. Lithko Oklahoma City’s part of this superstructure is:  50,000 square feet underground parking floor; 108,000 square feet (SF) 1st Floor Pan Slab – Main Lobby/Restaurants/Kitchens; 108,000 SF 2nd Floor Pan Slab – Ballrooms/Meeting Rooms/Convention Floor;  78,000 square feet 3rd Floor (Amenity Floor) – 23,500 square feet Outdoor Pool/Cabana Area with Bar – 17,500 square feet Spa – Remaining square feet is Roof; 22,000 SF Level 4 through 18 (typical Floor) Flat Plate Deck –3 cast in place Wall Cores – 1 stair core and 2 elevator cores, and 44 rooms per floor.

With no laydown area on site, all deliveries were coordinated and delivered by pour each day. Floors 5 through 18 were on a tight 6-day schedule floor-to-floor. Each day, the team met in the morning and afternoon to plan for flying tables, core wall/column placements, and rebar/PT installation to ensure we were able to complete each pour/floor.  The team reviewed production daily and sometimes twice a day to ensure we maintained our schedule.

Our team worked on this project for 1 year through snow, severe thunderstorms, and heavy wind. Even with all the inclement weather, our team delivered a quality, safe building on time to our customer.

Projects

Filter by:

Edited 600 S Tryon (2)

600 South Tryon

Description: Our Charlotte team used their expertise to successfully execute 25 floors of the cast in place structure, stairs and...

The Pearl Education & Research Buildings

Description: The Pearl buildings demanded, continuous logistical adaption due to the adjacent site infrastructure upgrades, including main powerlines. Starting with...
Factor 52 HGC PG (2)

Kenilworth Parking Structure

Scope of work: Foundations, walls, columns, slab on grade, framed deck, cast in place...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.