Pecan Deluxe 5

Customer

Richmont Construction

Owner

Pecan Deluxe Candy Company

Project Size

97,000 square feet

Project Location

Dallas, TX

Lithko Location

This manufacturing facility project featured a large industrial cooler with high-tolerance sloped concrete floors designed to manage water from candy production equipment and direct drainage throughout the facility.

Working within a constrained site, Lithko coordinated mobile crane operations for heavily reinforced elevated decks and refined concrete placement methods to achieve complex floor slopes and drainage requirements. The team also provided a value-engineered loading dock solution that reduced demolition, saving the owner time and cost while maintaining functionality.

Projects

Filter by:

U.S. Motorworks (16)

U.S. Motorworks

This manufacturing facility project features a complex tilt-up concrete structure built into a steep hillside, including a cast-in-place retaining wall...
Freshpet Manufacturing Expansion (2)

Freshpet Manufacturing Expansion

The Freshpet manufacturing facility required specialized industrial concrete construction, including high-tolerance sloped slabs, precision-formed curved concrete curbs, and freezer slab...
MIT 1, 2 3, (6)

MIT 1, 2, 3

This advanced manufacturing and research facility featured Utah’s first 18-inch jointless steel fiber reinforced concrete (SFRC) slab-on-grade, engineered to support...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.