Pinecrest Academy Wesley Chapel
Customer
Harvey Michaels
Owner
Avalon Park School Initiative III JV LLC
Industry
Project Size
70,026 square feet
Project Location
Wesley Chapel, FL
Lithko Location
This education construction project featured advanced tilt-up concrete construction with suspended spandrel panels, architectural concrete finishes, and connected multi-level structures. Custom design elements included radius window openings, reveal form liners, cantilevered slabs, and recessed architectural details that required precise formwork and coordination.
Built on a constrained active school campus, the project demanded complex logistics, including panel casting on beds, interior brace sequencing, multiple crane mobilizations, and coordination around student traffic and neighboring residents. Through detailed planning and trade coordination, the team successfully delivered a high-quality architectural school facility with complex structural and site requirements.
Projects
Filter by:

TTC Lemley

George Mason Elementary School





