Project Truck
Customer
Frampton Construction
Owner
Le Creuset of America
Industry
Project Size
300,000 square feet
Project Location
Charleston, SC
Lithko Location
This manufacturing facility construction project featured 100 tilt-up concrete panels, including complex geometric designs, architectural accent panels, and a specialized tilt-up pump room requiring panel erection within the building footprint.
Projects
Filter by:

U.S. Motorworks
This manufacturing facility project features a complex tilt-up concrete structure built into a steep hillside, including a cast-in-place retaining wall...

Pecan Deluxe 5
This manufacturing facility project featured a large industrial cooler with high-tolerance sloped concrete floors designed to manage water from candy...

Freshpet Manufacturing Expansion
The Freshpet manufacturing facility required specialized industrial concrete construction, including high-tolerance sloped slabs, precision-formed curved concrete curbs, and freezer slab...






