River Spirit Casino Resort

Customer

Manhattan/Redstone

Owner

Muscogee (Creek) Nation

Industry

Project Size

415,000 square feet

Project Location

Tulsa, OK

Lithko Location

The $365 million expansion of the River Spirit Casino in Tulsa, Oklahoma, included a casino, performing arts center, hotel, and precast parking garage. The Lithko Tulsa BURG’s scope on the parking structure included drilled pier foundations, walls, 75,000 square feet of slab on grade, and 333,000 square feet of precast topping slabs. For the 30-story hotel tower, our team installed drilled pier foundations, core shaft walls, 18,000 square feet of slab on grade, and 400,000 square feet of cast in place flat plate post tension decks.

Due to the excessive weight of the structures and close proximity to the river, the design called for massive drilled pier and cap foundations. We installed some temporary and permanent casing because of the water infiltration into the piers from the river.

The hotel tower had a multitude of perimeter embedded items in order to secure the glass and precast sections of the exterior façade. The large elevator and stair cores were constructed simultaneously and with a single self-climbing system. The weather in Oklahoma can change drastically throughout the day. We worked on this project all year long, so enduring every type of weather that Oklahoma had to offer including extreme heat, tornados, and ice storms. Even with the inclement weather our team successfully hit the schedule milestones, which were imperative to ensure the other trades could mobilize behind us.

We used resources from both the Tulsa and Oklahoma City BURGs due to the schedule and different types of competencies this project entailed.  We brought over one of our highly competent structural deck crews from Oklahoma City to build the flat plate slabs. Our consistent, regular sequence, the turnover rate of the floors, and our collaborative BURG effort was key to this project’s success.

Projects

Filter by:

Edited 600 S Tryon (2)

600 South Tryon

Description: Our Charlotte team used their expertise to successfully execute 25 floors of the cast in place structure, stairs and...

The Pearl Education & Research Buildings

Description: The Pearl buildings demanded, continuous logistical adaption due to the adjacent site infrastructure upgrades, including main powerlines. Starting with...
Factor 52 HGC PG (2)

Kenilworth Parking Structure

Scope of work: Foundations, walls, columns, slab on grade, framed deck, cast in place...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.