Riverside Crossing Park

Customer

Turner Construction

Owner

City of Dublin

Industry

Project Location

Dublin, OH

Lithko Location

Riverside Crossing Park will consist of two parks that will connect Historic Dublin and the Bridge Street District, which is split by the Scioto River.  Lithko’s Columbus BURG is working on the east side of the river, which includes cast in place walls, cast in place architectural benches, retaining walls, patios, and a vault that will house the mechanical and water feature for the walls.

This job is exciting and challenging to build. Due to the intricacies of the project, the entire job was drawn, uploaded into CAD, and managed by multiple line and grade coworkers to ensure quality control.  Coordination with other trades is critical due to built-in pluming, water features, and a variety of façade components that will be installed after our work is complete.

Furthermore, this is a public works project with a new in-use pedestrian walking bridge that crosses over the jobsite.  Due to a-typical pedestrian traffic around the jobsite, heighted safety precautions must be closely coordinated throughout the area. The project is anticipated to be complete in 2021.

Projects

Filter by:

Edited 600 S Tryon (2)

600 South Tryon

Description: Our Charlotte team used their expertise to successfully execute 25 floors of the cast in place structure, stairs and...

The Pearl Education & Research Buildings

Description: The Pearl buildings demanded, continuous logistical adaption due to the adjacent site infrastructure upgrades, including main powerlines. Starting with...
Factor 52 HGC PG (2)

Kenilworth Parking Structure

Scope of work: Foundations, walls, columns, slab on grade, framed deck, cast in place...