This industrial warehouse construction project was completed in just four months, with an additional two months for site paving. Despite excessive rainfall during foundation and subgrade operations, the team maintained schedule through proactive planning and efficient execution.

The structure featured complex tilt-up flag panels, requiring temporary bracing and specialized sequencing to ensure stability prior to steel installation. This project highlights Lithko’s expertise in tilt-up warehouse construction, industrial concrete paving, and fast-track manufacturing projects.

Projects

Filter by:

U.S. Motorworks (16)

U.S. Motorworks

This manufacturing facility project features a complex tilt-up concrete structure built into a steep hillside, including a cast-in-place retaining wall...
Pecan Deluxe 5 (1)

Pecan Deluxe 5

This manufacturing facility project featured a large industrial cooler with high-tolerance sloped concrete floors designed to manage water from candy...
Freshpet Manufacturing Expansion (2)

Freshpet Manufacturing Expansion

The Freshpet manufacturing facility required specialized industrial concrete construction, including high-tolerance sloped slabs, precision-formed curved concrete curbs, and freezer slab...