This university construction project featured massive cast-in-place concrete walls rising 40 feet to the roof and enclosing an 80-by-70-foot space. The scope included approximately 450 linear feet of 30-inch-thick walls with integrated brick ledges and monolithic concrete buttresses.
With limited laydown space and overhead power lines, Lithko utilized just-in-time deliveries, controlled material zones, and strategic rebar staging to maintain safety and productivity. Detailed logistics planning helped protect finished surfaces and keep this complex higher education concrete construction project moving efficiently.
Projects
Filter by:

George Mason Elementary School

9th and High




