Volvo

Customer

Whiting Turner

Owner

Volvo

Project Size

393,000

Project Location

Ridgeville, SC

Lithko Location

This automotive manufacturing facility expansion included a 200,000-square-foot mineral dry shake slab-on-grade processing area and 193,000 square feet of industrial site paving supporting logistics and plant operations.

A key challenge was the installation of the high-performance mineral dry shake floor system, which required the building to be fully enclosed prior to placement. Close coordination with the GC and trade partners helped maintain schedule despite industry-wide material supply chain shortages.

This project highlights Lithko’s expertise in automotive manufacturing construction, industrial floor systems, and large-scale concrete paving operations.

Projects

Filter by:

U.S. Motorworks (16)

U.S. Motorworks

This manufacturing facility project features a complex tilt-up concrete structure built into a steep hillside, including a cast-in-place retaining wall...
Pecan Deluxe 5 (1)

Pecan Deluxe 5

This manufacturing facility project featured a large industrial cooler with high-tolerance sloped concrete floors designed to manage water from candy...
Freshpet Manufacturing Expansion (2)

Freshpet Manufacturing Expansion

The Freshpet manufacturing facility required specialized industrial concrete construction, including high-tolerance sloped slabs, precision-formed curved concrete curbs, and freezer slab...

Locations

With locations all across the country, there are opportunities for you to join our team in a city near you.