Mixed Use
Mixed-use projects often require the concrete construction knowledge and skills used when executing on condos, apartments, retail buildings and parking garages combined. A command of multiple formwork, reinforcing, floor and structural/architectural systems is required. Most projects are fluid in nature, combining financing, permitting, design progression and schedule considerations that make this segment of concrete construction unique.
Lithko has a deep bench of talent and experience planning, preparing and executing on these projects. Our capabilities across multiple structure types, floor systems, hoisting configurations and reinforcing systems make us uniquely suited. Our Preconstruction Execution Process is of particular value to our customers as we are structured and prepared to provide design assist, value engineering, budgeting and scheduling to partner with all stakeholders in moving the project forward, while dealing with the fluid environment.
When field execution has started, Lithko’s Daily Preparation Process (DPP) allows us to be prepared and flexible to the changing conditions and needs of our customers, limiting risk for all stakeholders and obtaining the results desired.