Consolidated Metco

Distribution Centers

ConMetco, the leading supplier for the commercial vehicle industry, is opening a new 250,000 square foot facility in Monroe, NC. Sitting within a business park 300 feet from the airport, the factory will bring in 100 new jobs to the area. Once awarded the concrete package, our team was required to start the tilt up project within 3 days. Utilizing our robust planning processes made this quick turnaround a success.

Extreme weather and multiple design changes has kept this project interesting. Because of the 7,000-square foot office floor redesign, our team was unable to anchor the tilt panels to the slab on grade. Thus, our team used helical ground anchors for bracing the tilt-up wall panels.

Our total scope included the slab on grade, 115 tilt-up panels (height of 42.6 feet), slab on metal deck and exterior paving.

Details

Customer Choate Construction
Owner TKC
Size (finished slab) 250,000 square feet
Location Monroe, NC