CVG 3- Dermody

Distribution Centers

After completing the Wayfair Fulfillment Center, Lithko secured the second distribution center for Dermody Properties at CVG (Cincinnati/Northern Kentucky International Airport). Our scope includes foundations, footings, slab on grade, tilt-up panels, paving, and sitework.

During the planning process, our project team identified a few potential schedule and logistic issues. With the location of the project site being directly across the street from a residential unit, we needed to be mindful during night concrete placements. By using our Daily Preparation Processes, we remedied the situation by moving the truck entrance. This logistical change minimized the noise and light disturbance to the adjacent residents.

Utilizing our Project Execution Process, we developed a detailed plan to accelerate the project schedule. With the winter quickly approaching, we needed to ensure completion of the tilt up panels. By following our plan and tracking outcomes daily, we were successful in erecting all 119 tilt up panels two weeks ahead of schedule. We protected quality by double checking the location of embeds and reveals in the panels before placing the concrete.

Details

Customer United Construction Midwest
Owner Dermody Properties
Size (finished slab) 254,000 square feet
Location Hebron, KY