In the heart of downtown Denver, a new 176-unit mixed use building is under construction. Our package includes drilled piers, foundations, pier caps, grade beams, slab on grade, columns, two stair cores, one elevator core, shear walls, and post tension structural decking. There are 5 ½ levels of a cast in place parking structure, including a podium slab on level 6 with prescient framing. The slab on grade will incorporate multiple elevation changes as well as cast in place walls and retail space.

Downtown construction always poses logistical challenges due to limited laydown space and entrances into the site. Our team is heavily focused on detailed coordination of all our deliveries, concrete pump set up and truck staging. Our daily plan process has been key to the forward momentum of the project while working around and coordinating with the other trades.

Details

Customer CFC Construction
Owner Argyle Residential
Size (finished slab) 105,000 square feet
Location Denver, CO
Other Projects in Mixed Use